El-Dabaa Corridor / Mostakbal Masr
Flow Serve Role: Construction Partner
Client: SIAC S.A.E Main Contractor : Future of Egypt for Sustainable Development Authority
Duration: 4 Years
Completion: on going
Capacity: 400,000 FEDDANS
Scope of Work:
Networks to be installed include the following:
- Prestressed pipeline length 29 km in diameter (1200mm to 2500mm)
- Steel pipeline length 148 km in diameter (1200mm to 3000mm)
- HDPE pipeline length 255 km in diameter (200mm to 1000mm)
- UPVC pipeline length 300 km in diameter (200mm to 315mm)