Supply, Fabrication & Erection Process Metallic & Non-Metallic Piping and Laying (Above &Under-Ground) Pipelines

Major process piping and pipeline projects for oil, gas, petrochemical, power and heavy engineering

plants are executed. The scope includes process piping fabrication, pipeline and piping

installation, testing and commissioning. Work also comprises the installation of above-ground

and under-ground process piping systems, which includes the design, detailing, supply of

materials, fabrication, routing of new pipelines, tie-ins to existing lines, excavation and burial of

lines, casting all necessary supports, foundations, manholes, coating and wrapping buried

piping, testing, ushing, pigging, disinfection, and painting.

FPS has completed numerous high- and low-pressure piping projects of carbon steel, alloy

steel, stainless steel, duplex stainless steel and other special grade materials using SMAW,

GTAW, FCAW and SAW welding processes with supply below items: -

  • Provide the required competent, Labors, Consumables, Tools and Equipment to perform and report the work generally and specically described in a diligent, skillful, safe, professional and workmanlike manner.
  • Planned, unplanned and On-Call emergencies welding activities inside workshops and facilities including:
  • Pre-fabrication, fabrication and Erection for Metallic (steel structure, plates, pipes, ttings Tanks, Vessels and any other static equipment including SMAW & GTAW
  • Fabrication and Erection for Non-Metallic pipes and ttings (FRP, UPVC, HDPE and PVC).

Tanks …etc. and associated support.

With Proof of competency (e.g., Welder Qualication Certicates) and machines calibration certicates